Road Resurfacing | Dixon Street
NOTICE OF ROADWORKS - Dixon Street is scheduled for a Reseal as part of the Council’s Annual Resurfacing Programme
WORK INVOLVES: Application of hot bitumen and sealing chips, followed by sweeping and removal of excess chips at least 48hrs post sealing.
WHEN: 7th March 2025 – 8th March 2025 (Weather dependent)
ROAD NAME: Dixon Street Ch1648–Ch2267 (Kuripuni Intersection to Russell St)
START AND FINISH: Between the hours of 7am to 7pm.
WEATHER: In the event of bad weather or other unforeseen circumstances the work may be delayed until the next available fine day.
VEHICLE ACCESS: Your normal vehicle access will be restricted with a road closure in place in blocks (Kuripuni Intersection to Herbert Street and Herbert Street to Russell Street) to allow new surfacing to be applied. If you are unsure, please do not hesitate to ask one of our staff on site.
PARKING: Can you please ensure your vehicle is not parked on the street during the above period. One of our friendly staff may come knocking on your door prior to the works operation for its removal. If the owner cannot be located, either a friendly note will be left on the vehicle or may be towed and returned on completion.
SAFETY: Please warn children of the dangers posed by roadworks. Ensure that they stand well back, preferably from within your property boundary. Also please ensure all pets are well secured within your section during the sealing operation.
WE’LL BE BACK: All new sealing works require routine sweeping. This will be monitored and carried out as required to remove excessive loose chips. Please be careful of loose chips on footpaths and across driveways.
The Council has contracted Higgins Wairarapa to do this work. For further information about this project, please contact the person mentioned below or alternatively approach the supervisor on site.
Apete Dawai
Higgins Wairarapa, Tel (06) 370 0444