Road Resurfacing | Te Ore Ore Road
NOTICE OF ROADWORKS - Te Ore Ore Road is scheduled for a Reseal as part of the Council’s Annual Resurfacing Programme
WORK INVOLVES Application of hot bitumen and sealing chips, followed by sweeping and removal of excess chips at least 48hrs post sealing.
WHEN Between the 24th February 2025 – 1st March 2025 (Weather dependent)
ROAD NAME:
Road Name | Start RP | End RP |
TE ORE ORE ROAD (SH2 to Totara/Blair St ) - SHOULDER ONLY | 40 | 296 |
TE ORE ORE ROAD (Totara/Blair St - Colombo Intersection) - FULL WIDTH | 356 | 740 |
TE ORE ORE ROAD (Colombo Intersection - Gordon Street Intersection) - SHOULDER ONLY | 740 | 1096 |
TE ORE ORE ROAD (Gordon St – Te Ore Ore Bideford Intersection) - FULL WIDTH | 1096 | 2288 |
START AND FINISH Between the hours of 7.00am to 7.00pm
WEATHER In the event of bad weather or other unforeseen circumstances the work may be delayed until the next available fine day.
VEHICLE ACCESS Your normal vehicle access will be restricted for a short period of time (10minutes approx.) to allow new surfacing to be applied. If you are unsure, please do not hesitate to ask one of our staff on site.
PARKING Can you please ensure your vehicle is not parked on the street during the above period. One of our friendly staff may come knocking on your door prior to the works operation for its removal. If the owner cannot be located, either a friendly note will be left on the vehicle or may be towed and returned on completion.
SAFETY Please warn children of the dangers posed by roadworks. Ensure that they stand well back, preferably from within your property boundary. Also please ensure all pets are well secured within your section during the sealing operation.
WE’LL BE BACK All new sealing works require routine sweeping. This will be monitored and carried out as required to remove excessive loose chips. Please be careful of loose chips on footpaths and across driveways.
The Council has contracted Higgins Wairarapa to do this work. For further information about this project, please contact the person mentioned below or alternatively approach the supervisor on site.
Apete Dawai
Higgins Wairarapa, Tel (06) 370 0444